|
The
Viaduct is 1.4km long and comprises 14 spans of
99.9m resting on well foundations.
The construction is balanced cantilever type with precast
match-cast segmental construction.
Expansion joints are provided
at about every 200 meters.
The
superstructure is made integral with twin leaf piers. Dar Consultants (UK) are the designers of the bridge. |