Rail Bridge Over Berdewadi Nullah - 1993 : 85m

Owner

Konkan Railway Corporation Limited

SPA's Scope

Prime Consultants
   

The 85m long bridge crosses a 30m wide nullah and supports a single-line railway track with a walkway on one side.  The abutments are spill-through.  The superstructure is a continuous reinforced concrete flat beam with 10m spans.  The reinforced concrete piers are 18m high with a monolithic joint with the deck.  The superstructure was cast on specially fabricated steel trusses which were moved as the construction progressed.  Monolithic construction ensures a slender and maintenance-free construction.