| B.E
(Civil), Retd I.R.S.E
Fellow, Institution of Civil Engineers (India) | Member, American Concrete Institute
(India Maharashtra Chapter) | | Founder Fellow, Institution of P-Way Engineers (I) | | | | Representative project Experience : Joined SPA Consultants Private Limited joined in
1992 Responsibilities : Projects - in - charge of 1048 tenements Mass Housing Scheme costing Rs. 22 crores at Belapur for CIDCO,
and Rs 25 crore at Nerul, construction of railway station building
complex at Sanpada. Construction of 4 lane road over bridge on
Belapur-Panvel railway line on NHB4B near Khandeshwar FOB on
expressway near Juinagar railway station. Construction 5000
nos one room tenement Housing projects for Nagari Nivara Parishad
trust at Malad (E) costing Rs 150 crores. Construction of 2614
one room flats and 5 towers
(G+7), 6 towers (S+18) for Shivshahi Punarvasan Prakalp at
Goregaon (East) costing Rs 150 crores. Chief Project Manager/General Manager
- IRCON (G.O.I.
Undertaking under Ministry of Railways)
Design, Planning and Construction of Railway lines (Turbe - Sanpada, Sanpada
- Belapur, Belapur - Panvel in New Bombay Planning Construction of station buildings in New Bombay at Vashi, Sanpada, Nerul, Juinagar, Belapur.
Quality control earth work, concrete R.C.C. prestressed, concrete and track (1988-1992) Senior Manager (IRCON) Vashi
Construction of new railway line (Turbhe - Sanpada - Belapur -
Panvel) bridges earthwork in New Mumbai. New Bombay Railway projects a station buildings in New
Bombay (1986-1988) Ingenieur Generale (Chief Engineer) in Algeria. Responsibilities Planning, design and construction of R C and prestressed concrete bridges, Via-ducts, earth work, track, etc., quality control earth work bridges and tracks in connection with railway project in Algeria.(1982-1986) Senior Manager (IRCON), New Delhi, Government of India. Responsibilities : Planning Railway Projects in Iraq and Algeria, including procurement of
machinery,
man power Managing etc. (1981-1982) Deputy
Chief Engineer (MTP) Mumbai
Design and construction of bridges, yard re-modelling, soil investigation
and planning of metro in Mumbai (1971-1981). Assistant Engineer (Railways) Government of India Responsibilities :
Doubling of Railway lines between Gondia and Nagpur. Construction of Marshalling yard at Bhilai and Raurkela. (1959 – 1962) Assistant Engineer - Kosi Project Government of Bihar Design and construction of buildings, sluices, head regulators etc. (1955 – 1959) Civil
Engineer - Construction 100 meter high concrete dam at Vaitarna
(near Mumbai)
Design of mixes, quality control, quarry product control.
Hindustan Construction Company Krishna canal extension (Bombay PND)
(1951-1954) [Back] |